Available For Lease

2 MW West Texas (fully built): Unregulated ERCOT market. Own meter. Immersion Cooling. All infrastructure in place. Available now.

1 MW-2 MW Florida (fully built):  fully built out warehouse location. Available now.

10 MW West Texas site. This site requires upgrades on substation with completion about 12-24 months.

2 MW West Texas site for storage batteries installation. Available now.

Contact us at contact@veribi.com.